BusinessObjects 4.3 and BI 2027: what to do before December
On December 31, 2026 mainstream maintenance ends for SAP BusinessObjects BI 4.3, and SAP has already published a preview of BI 2027, the release it plans to ship by the end of the first quarter of 2027. Here is what changes on January 1, what BI 2027 brings and which technical prerequisites are worth checking from now on.
Summary
According to SAP Community, November 2026- Confirmed date
- On December 31, 2026 mainstream maintenance ends for BI Platform 4.3 and its whole suite. From January 1, 2027 it moves to Customer-Specific Maintenance (CSM).
- What CSM covers
- During the first 12 months, security fixes for high and very high vulnerabilities (CVSS 7.0 or above) on 4.3 SP05. After those 12 months, no new security fixes.
- Destination available today
- SAP BusinessObjects BI 2025.
- BI 2027
- General availability planned for the end of the first quarter of 2027. SAP states that content and timelines are subject to change.
What to do before December 31
If you only have a few minutes, start with this list, which runs from most urgent to least.
- Take inventory first. Confirm which systems run BI Platform 4.3, Crystal Server 2020, Crystal Reports 2020, Crystal Reports for Enterprise 4.3, Live Office 4.3, IPS 4.3 or Lumira 2.x. They all share the same date.
- Check how your users authenticate. SAML was already deprecated in BI 2025 and BI 2027 stops supporting it. If you use it, plan the move to OpenID Connect with your identity team before upgrading.
- Check where it runs. From BI 2027 only the embedded Tomcat is supported, so external application servers, including IBM WebSphere Liberty 25, are removed. AIX and Solaris are no longer supported, and the minimum is Windows Server 2022, RHEL 9 or SLES 15 SP7.
- Decide the destination. BI 2025 is available now and BI 2027 is planned for the end of the first quarter of 2027. If you cannot finish before December 31, CSM is a 12 month bridge with high severity security fixes, not a place to stay.
- Size up your Crystal reports. BI 2027 brings a migration wizard and API for CR4E reports and for CR 202x .unv reports. Counting how many you have lets you estimate the effort.
- Verify the databases you query. BI 2027 asks for minimum versions, for example PostgreSQL 15 and SQL Server 2017. The connectivity table is in the prerequisites section.
- Reserve time for testing and training. BI Launch Pad changes significantly, and Web Intelligence reports created with the BI 2025 responsive layout will not be editable or exportable as WIDX in BI 2027.
What happens on December 31
On December 31, 2026 mainstream maintenance ends for BI Platform 4.3. That does not switch your system off, and your reports will keep working. What changes is what SAP delivers to you from January 1.
-
Until 2026
Mainstream maintenance
From October to December, SAP prioritizes high and very high priority issues on 4.3 SP05. Medium and low priority fixes go to future BI 202x releases.
-
12 months
CSM, from January 1, 2027
Security fixes for high and very high severity (CVSS 7.0 or above). Support cases stay open, but only known issues are addressed with the existing knowledge base.
-
After that
No security fixes
Once the 12 months of CSM end, SAP delivers no new security fixes for BI 4.3 SP05.
Covered products and CSM scope
The date applies to the whole BI 4.3 suite, according to note 3486924 as cited by SAP: BusinessObjects BI Platform 4.3 (server, client tools and SDK), Crystal Server 2020, BusinessObjects Live Office 4.3, Crystal Reports 2020, Crystal Reports for Enterprise 4.3, BusinessObjects Information Platform Services 4.3 (IPS for Data Services) and Lumira Server and Client 2.x.
CSM is not the same as mainstream maintenance. New, reproducible issues are no longer fixed in 4.3 but in the actively maintained versions, BI 2025 and later. SAP describes it as a bridge that gives you time to migrate, not as a destination. For the detail of security corrections during CSM, SAP points to note 3053725.
What BI 2027 brings
SAP previewed the new capabilities in an SAP Community blog, with the caveat that content and timelines are subject to change. They concentrate on three fronts.
| Component | What changes |
|---|---|
| BI Launch Pad | The largest user experience overhaul to date. Tabs to open several documents in one session, a three-state navigation panel, customizable login and home pages and self-service SAP Logon token generation. |
| Web Intelligence | A new responsive layout for interactive dashboards, alongside the classic layout for paginated reports. A new generation of interactive charts and tables, WIDX export as standalone HTML and mobile support through a Progressive Web Application. |
| Crystal Reports | A migration wizard and API for CR4E and CR 202x .unv reports, a managed relational connections driver in preview and a REST SDK with refresh and interactive parameters. |
Detail of the new capabilities by component
BI Launch Pad. Documents open in dedicated content tabs and several reports can be viewed side by side. The navigation panel has three states (expanded, collapsed or hidden) and new Web Intelligence documents can be created from a tab without leaving the session. The login page and the home page are fully customizable: you can embed internal web pages, upload a background image, set environment labels (Dev, QA, Prod) and broadcast messages. Each user can pick a theme and a profile picture, have a quick access menu with pinned documents and favorites, and schedule or see history in one click.
There are also administration changes. Each user generates their own SAP Logon token from the home page without asking an administrator, and the data source mapping for Database Single Sign-On is configured once and persists across sessions. Personal and public content are visually separated to avoid unintended changes, instance management remembers each user's filters, and scheduling and publication are harmonized between BI Launch Pad and the CMC for Web Intelligence, Crystal Reports, Lumira and Analysis for Office. Search is simplified and its results open in their own tab.
Web Intelligence. Two layouts coexist within a single document model. The responsive one is meant for interactive dashboards, adapts to up to four screen sizes (mobile, tablet, monitor and widescreen), supports only the new interactive charts and tables and exports only to WIDX. The classic one does not change: it is for paginated, pixel-perfect reports and exports to PDF, Excel and HTML. Reports created with earlier versions keep opening, but those created with the BI 2025 responsive layout mode will not be editable or exportable as WIDX.
The interactive charts and tables introduced in BI 2025 are deprecated and replaced by a new generation. It brings chart types such as sunburst, variwide, funnel and pyramid, plus in-place filters, custom tooltips, hyperlinks, show difference and aggregation, drill focus on hierarchies and export to Excel and CSV. Scrollable tables, both vertical and cross tables, allow in-place sorting and filtering, frozen headers and footers, hierarchies and micro-charts with dynamic thresholds, and handle more rows.
For designers, a document can be used as a style model, and there is a floating format toolbar, a reorganized format panel and groups of groups. A custom script block also arrives, in the responsive layout only, where you can embed JavaScript, including AI-generated code, as a custom chart or widget compatible with WIDX. There is also a navigation list to use a document as a landing page for a predefined list of reports.
Crystal Reports. The migration wizard in the designer prompts you when you open CR4E or CR 202x .unv reports and guides the process, and the migration API allows programmatic bulk migration. The managed relational connections driver, still in preview, lets Crystal Reports consume the connections governed by the platform, a key gap for customers migrating from CR4E. The REST SDK adds refresh and interactive parameters and was back-ported to BI 2025 patches. In the query panel you can paste the XML query specification from CR4E, and there is an object comparison filter, a combined query and descendant selection in the BW member selector. The BW DSL driver adds hierarchical grouping and HTTPS support for graphics location.
Technical prerequisites worth checking now
SAP flags three hard requirements that take effect with BI 2027. They are not patches but architecture changes, so it is better to treat them as a project and not as a weekend task.
-
Java application server
Up to BI 2025
It can be an external server, such as IBM WebSphere Liberty 25, the last external option supported in BI 2025.
BI 2027
Only the embedded Tomcat is supported. If your deployment uses an external server, you must migrate before upgrading.
-
Authentication
Up to BI 2025
SAML, which was already deprecated in BI 2025.
BI 2027
Only OAuth 2.0 and OpenID Connect. OpenID Connect covers all authentication modes and OAuth is also supported for SMTP.
-
Operating system
Up to BI 2025
Windows and Linux and, up to BI 4.3, also AIX and Solaris.
BI 2027
Windows and Linux. AIX and Solaris are no longer supported, and CR 202x services are Windows-only from BI 4.3 SP2.
| Operating system | Minimum | Recommended |
|---|---|---|
| Windows Server | 2022 | 2025 |
| RHEL | 9 | 10.x |
| SLES | 15 SP7 | 16 |
| Database | Minimum | Latest certified |
|---|---|---|
| PostgreSQL | 15 | 18 |
| Teradata | 17 | 20 |
| Microsoft SQL Server | 2017 | 2025 |
| IBM Db2 for z/OS | 12 | Not stated |
| Greenplum | 7 | Not stated |
Where your Basis team comes in
Almost everything above is platform work and not report work: the version inventory, the authentication migration, the application server change, the operating system update, the connectivity validation and the coordination of tests with the report owners.
BusinessObjects is a separate product from S/4HANA and is not part of the RISE package. Confirm in your contract or with your provider who administers it today, because that person is the one who should lead this plan, and do it early: there are about six weeks left until December 31.
Sources consulted
- SAP BusinessObjects BI 2027 preview, SAP Community, November 2026. New capabilities, technical prerequisites and planned availability.
- What SAP BI Platform 4.3 customers need to know before 31 December 2026, SAP Community, November 2026. Mainstream maintenance and CSM dates.
- SAP Notes 3763590, 3486924 and 3053725, cited by SAP in those posts for the dates, the CSM scope and the security corrections. They require an SAP for Me user.
- SAP BusinessObjects BI and SAP Data Services Statement of Direction, October 2026 update, which SAP recommends for the maintenance dates per component.
If you want someone to review your BusinessObjects landscape, build the inventory and coordinate the migration before December 31, let's talk.